Power Plant

  1. P-59 boilers.
  2. Replacement of defective tubular air preheaters with full backsight all sizes.
  3. Admitted to the implementation.

Performance parameters :Heat transfer areaHeated air
Flue gas inlet, С°31015
Flue gas outlet, С°160240
Volumetric size, Nm3/h825 000585 000
The pressure loss in the heat exchanger channels, mmWg92160
Heat power, kWt48 114



Boilers.

  1. Fuel - heavy oil.
  2. Implementation of the heat recovery system within the program of improving energy efficiency.
  3. Result: During the operation, the indicators specified in the specification, the declared efficiency and the payback period have been achieved.

Performance parameters :Heat transfer areaHeated air
Flue gas inlet, С°270-18
Flue gas outlet, С°18870
Volumetric size, Nm3/h13 62013 620
The pressure loss in the heat exchanger channels, mmWg3273
Heat power, kWt429

The gas turbine power plant.

  1. Gas Turbine Power.
  2. The introduction of heat exchanger operating on water heating.
  3. The result: In the course of operation, the efficiency is more than planned.

Performance parameters :Heat transfer areaHeated water
Flue gas inlet, С°19020
Flue gas outlet, С°9095
Volumetric size, Nm3/h19 40032
The pressure loss in the heat exchanger channels, mmWg34-
Heat power, kWt733